Skip to main content

News

GH2 to install H2 production unit at Port of Bordeaux

GH2 and Bordeaux Port have signed an agreement for the establishment of the largest production and conversion of renewable hydrogen in the Nouvelle Aquitaine region in France.

Resulting from three years of conceptualization and structuring, the GH2 project is strategically located in the port area near Bordeaux, in the heart of the industrial platform dedicated to chemicals and hydrocarbons, in the town of Ambès, alongside the Garonne river.

The GH2 project aims to produce up to 14,000 t of renewable hydrogen per year and will avoid up to 130,000 t of greenhouse gas emissions annually. Innovative in terms of technology, size and structure, the project benefits from strong support from its various local, national and European partners.

Integrating from its conception an electrochemical plant for the production of hydrogen and ammonia, as well as a plant for the production of renewable electricity from photovoltaic origin, the GH2 project in Ambès symbolizes the emergence of a national and European hydrogen sector at scale, and concretely contributes to the energy transition.  

With a total electrolysis capacity of 100MW, the GH2 project in Ambès is one of the largest projects of this type in France and in Europe, and fits perfectly into the dynamics launched by the French government through its Recovery Plan, and by the European Union with the Innovation Fund and the Green Deal.