Skip to main content

News

Enapter sets goal of developing its entire production process to run without negative impacts on the environment

The electrolyzer producer Enapter has set itself the goal of developing its entire production process to run without negative impacts on the environment. As an important step on this journey, it is building the Enapter Campus production facility, which will be powered entirely from renewable energy produced on-site and in the neighboring Bioenergiepark. The site in Saerbeck, North Rhine-Westphalia, combines electrolyzer production, an R&D building, administration and office space, as well as a cantine over 82,000 square meters. Now the company wants to investigate what other measures can be implemented to achieve its Life Cycle Impact Zero aspirations – together with researchers from Fraunhofer UMSICHT, The Wuppertal Institute and The Institute of Sustainable Nutrition (iSuN) of FH Münster.

With the Life Cycle Impact Zero project, started on April 15, 2022, the parties want to develop and apply an especially comprehensive and holistic approach to environmental assessment. This includes chemical manufacturing and electrolyzer production, as well as matters like the use of energy and water resources, the generation of waste or the human factor in general. This is intended to cover all interactions between business and people. That includes Enapter’s employees, but also people in upstream and downstream value chains, users of the technology or residents close to the production site. A concept for sustainable employee catering is also being developed.

“On top of this, the project comprehensively explores the recycling of critical raw materials that are essential for electrolysis, which only emphasizes the pioneering character of Life Cycle Impact Zero,” said Dr. Henning Wilts, Director of the Circular Economy Division at The Wuppertal Institute. 

The basis for all environmental assessment that will be carried out is ISO 14040. The recognized international standard divides the research into four phases: Aim and scope of the study, inventory analysis, impact assessment, as well as interpretation. Sensitivity analyses and scenario techniques are also used as further methods.

Based on these analyses, the 18-month project should derive concrete measures to avoid negative environmental impacts completely, if possible, for example in production, employee mobility or in energy supply. Furthermore, it will examine whether these measures are transferable to Enapter’s other locations – such as in Italy. Following on from the project, the steps defined should be implemented by Enapter in the next phase. In the subsequent Phase 3, a renewed analysis is planned. This will determine if the technological innovations achieved by then in the production and use of Enapter’s electrolyzers can enable additional ecological improvements. 

“Electrolyzers are a key component of a future hydrogen economy. We are excited that, together with Enapter and our scientific partners, we can work to anchor this technology regionally and in NRW, and in doing so, advance the achievement of important sustainability goals,” said Jürgen Bertling, Deputy Head of Department Sustainability and Participation at Fraunhofer UMSICHT.